drugcheck-app-16-6.jpg

Virar-alibaug Multimodal Corridor Pdf -

The is a 126 km, access-controlled expressway designed to halve travel time between Virar and Alibaug . Originally planned by the MMRDA , the project was transferred to the MSRDC in 2020 and is now being developed on a Build-Operate-Transfer (BOT) model with a total estimated cost exceeding ₹55,000 crore. 📄 Key Project Documents (PDFs)